3. Determine Zone Boundaries
Before tubing is installed, visually inspect the area to determine the
zone boundaries. This helps determine where the first circuit is to be
placed, while identifying any obstacles.
4. Confirm Tubing Requirements
• Measure the distance from the
manifolds to the farthest point in
the zone via right angles.
• Make sure the minimum circuit
length is at least twice this distance.
If not, the tubing will not be long
enough to reach the farthest point
of the zone and return.
5. Install Tubing
• Pull one end of tubing off the
unwinderandattachittotherst
barb of one of the manifolds.
• Install using a single serpentine
pattern, keeping the tubing 6"-8"
(152.4 mm - 203.2 mm)
from the edge of the slab.
• Pay attention to the footage marking
on the tubing and cut at the
correct length.
• At expansion/control joints, the
tubing may be passed under the
area or must be sleeved with
Armaflex
®
or PVC to pass through
expansion/control joints (see
Expansion Joints for details).
• Use 1/2" (12.7 mm) tubing for the
radiant floor.
• Use 3/4" (19.1 mm) or
1" (25.4 mm) Heating PEX or
Heating PEX-AL-PEX for supply
and return lines to the zone.
Supply Manifold
Return Manifold
Slab
Supply Manifold
Return Manifold
Slab
Manifold
Location
Manifold
Location