None Ele-Flg2019HF- Mini Pallet Manual de instrucciones

Busca en linea o descarga Manual de instrucciones para No None Ele-Flg2019HF- Mini Pallet. none Ele-Flg2019HF- Mini Pallet Instructions / Assembly Manual de usuario

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 1
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 0
FlagStone Installation Sheet
Pull all the agstones out of the package and look
for the different tab congurations – they are
“One,” “Two,” & “Three”. Start laying out the
pattern prior to commencing.
STEP 1
Align the straight edge sides together and make
sure the tabs are all in the center area.
STEP 2 (refer to diagram)
Line up the curved points to properly align the
center of our pattern. Make sure to line up the
tabs accordingly.
STEP 3 (refer to diagram)
Align grout joint using the clearly marked spacer
on the package. Cut out the spacer with scissors
and use to keep the grout joints equally spaced.
STEP 4 (refer to diagram)
Clean the surface with a wire brush or power wash,
to insure a clean surface.
STEP 5
Mix “Polymer Thin-set” as needed and apply with
a 1/2” notch trowel.
STEP 6
Apply agstones as pictured and rmly push them
into the thin-set. Allow thin-set to dry approximately
12 hrs prior to starting the grouting process.
STEP 7
Mix grout as selected and use sponge or grout
bag to apply and clean with water after. Allow
roughly 12 hours prior to walking on your new
agstone project.
STEP 8
STEP 2
STEP 3
STEP 4
Vista de pagina 0
1

Indice de contenidos

Pagina 1 - FlagStone Installation Sheet

FlagStone Installation SheetPull all the agstones out of the package and look for the different tab congurations – they are “One,” “Two,” & “Thr

Comentarios a estos manuales

Sin comentarios